Railway line rehabilitated with N1.6bn overgrown with bush The Federal Government’s newly rehabilitated rail loop lines linking various oil tank farms at Apapa, Lagos have been overtaken by thick bush, eight months after rehabilitation, Financial Vanguard investigation has revealed. The project which was handled by China Civil Engineering Construction Corporation, CCECC, has remained unused after it was completed. The rail to tank farm project which involved laying of tracks into the farm yards, so that petroleum products can be hauled directly into rail tank wagons was completed in December, 2014 and cost the Federal Government N1.6 billion. The tracks were upgraded from 60 to 85 pounds in order for the tracks to be able to withstand the expected increase in weight that will result from direct haulage of petroleum products by rail. Recall that the Managing Director, Nigeria Railway Corporation, NRC Engr. Adeseyi Sijuade who spoke through the Director, Mechan...
Comments
Post a Comment